NOTICE
 

Two trial sailings of "Aberdeen - Sok Kwu Wan (via Mo Tat)”ferry service scheduled at 6:05 pm from Sok Kwu Wan to Aberdeen via Mo Tat and 7:05 pm from Aberdeen to Sok Kwu Wan via Mo Tat on Mondays to Saturdays (except public holidays) have been introduced since 1 April 2021 for a period of 2 months (i.e. the trial period will end on 31 May 2021). Due to persistent low patronage on Mondays to Fridays observed during the trial period, the two sailings on Mondays to Fridays will be suspended upon the end of the trial period. The affected passengers could take other sailings for traveling between Aberdeen, Mo Tat and Sok Kwu Wan. For the service on Saturdays, the two sailings concerned will be formalised with effect from 1 June 2021 to cope with the passenger demand.


For enquiry : Tel: 2375-7883 or Fax: 2317-0819 or email: info@ferry.com.hk

Chuen Kee Ferry Ltd.

May 26, 2021